Restoration on a Poorly Installed Older Modified System that the Customer in Harper Woods could not find a Contractor that would Repair His Roof and only offered Replacement
Repaired Flashing with Modified and Restored Roof Over Office with an Energy Efficient System with a 10-Year renewable Warranty for Maple Benstien Proprieters
Energy Efficient Systems applied on areas of Clark Middle School Detroit Public Schools
Cleaned and Repaired Duralast Roof System (3 other Contractors only offered Replacement) Repaired and Restored 2-Year Old Modified System with several Leaks with an Energy Efficient System
Epdm Flashing Repair on a Firestone Ballast Roof System for Gas Cylinder Technologies Replaced Ballast Roof on Front Office Area
Restored a Failing Modified System with our Energy Efficient System for Eastland Properties
Energy Efficient System Applied at Magni-Industries (5-year old 27,000 sq ft Epdm Roof System)
Burns Elementary School: Restoration of a 18 Year Old Granulated Modified Roofing System with a Energy Efficient System. The 18,000 square feet Roof System is now under a 10-Year Warranty
The Ambient Temperature 80F The Existing Roof 141F and the New System at 79F
Bennett Middle School: Restoration of a 3-Ply Bur Roof System with a Energy Efficient System witha 10-Year Warranty
SLC Meter: A 24,000 Square Foot Epdm Restoration with an Energy Efficient Roof System and 10-Year Renewable Warranty. Adjacent Roof is a 22,000 square foot Ballasted Epdm Restoration
Central United Methodist Church: Several Modified and BUR Roof System Restored with an Energy Efficient Roof System
Shar Inc: Restoration of 16,000 Square Feet of Modified Roof and Repaired BUR Roof